Thursday, 15 September 2011

Shooting schedule

This shooting schedule is to allow myself and Daisy know exactly what we have to be doing on days of filming. We have decided to film on both weekdays and weekends as we wish to use locations inside of school which will need to be open and locations outside of school that are easy to use without supervision.

Monday 19th September- on this filming session we wish to get the all of music studio shots as we will be filming after school for this we will be needing full access to the music studio. Myself and daisy will set up the studio before the band arrives which will make filming easier as we can start straight away. If we complete all the required shots we want for this will shall move to the outside locations such as the walls and the fields and shoot these.

Sunday 25th September- on this filming session we will complete any shots we weren’t able to get around the outdoor locations in college. We will also walk down into Stapleford and get the required shots outside the factories. For this day we will have to ensure the camera is full charged as there will not be an easy way of recharging it without leaving the location.
Further dates will be confirmed if certain shots are not completed.

No comments:

Post a Comment